For shift work in car workshops and container systems, for converting locomotives without own power or for moving electric locomotives without traction lines in railway works, the Lokomotivbau Elektrotechnik Werke (LEW) in Hennigsdorf delivered the first series of a battery-towing vehicle based on the proven mining locomotive EL8 to the Deutsche Reichsbahn from 1966 onwards. Due to the low cost of acquisition, low maintenance and zero-emission operation, the small shunters could and can be used universally and proved and proven well. Up to 1990 506 vehicles were built. After the ASF was basic equipment in all railway operations and maintenance works of the German Railways in the beginning and in many industrial operations in East Germany, the small shunter after the foundation of Deutsche ...
Arnold5063129023416
Price: £164.99 from Conrad Electronic
| Stockist | Price | |
|---|---|---|
| £164.99 | Visit Store |
In order to increase the speed of passenger train traffic, the Deutsche Bundesbahn developed the E03 series in the 60er. The pre-series locomotives E03 001 to E03 004 were available from 1965. These locomotives, referred to as 103 001 to 103 004 from...
10-unit pack ARNOLD standard coupler heads for NEM-recording.This text is machine translated.
In order to increase the speed of passenger train traffic, the Deutsche Bundesbahn developed the E03 series in the 60er. The pre-series locomotives E03 001 to E03 004 were available from 1965. These locomotives, referred to as 103 001 to 103 004 from...